Search site
Cymraeg
House

YGG Gwyr, Talbot Green, pre-planning application consultation

Have your say: consultation before applying for planning permission at YGG Gwyr, Talbot Green, Gowerton, Swansea.

If you would like this information in an alternative format e.g. Large Print, please contact Building.Services-PlanningRepresentation@swansea.gov.uk

Building Services have been commissioned by Swansea Council Education Department to undertake the pre-application consultation in respect of the 21st Century Schools and Education Programme - a proposed two storey stand-alone block, inclusive of all substructure works. The proposed works development will also include the installation of external artificial playing surfaces, minor remodelling of the existing Drama and Kitchen / Canteen blocks at Ysgol Gyfun Gwyr, Talbot Green, Gowerton, Swansea.

Notice is hereby given that the Education Department is intending to apply to Swansea Council for planning permission for the following development:

21st Century Schools and Education Programme - a proposed two storey stand-alone block, inclusive of all substructure works. The proposed works development will also include the installation of external artificial playing surfaces, minor remodelling of the existing Drama and Kitchen / Canteen blocks.

Prior to formal submission to the Planning Authority and in accordance with the requirements set out in Part 1A of the Town and Country Planning (Development Management Procedure) (Wales) order 2012 the proposal will be subject to pre-application consultation.

All relevant drawing, reports and supplementary supporting documents are made available for inspection and review below.

Proposed plans and surveys 

PDF Document YGG Gwyr Planning Statement (PDF, 941KB)Opens new window

PDF Document YGG Gwyr Planning Application (PDF, 189KB)Opens new window

PDF Document YGG Gwyr As Existing Site Plan (PDF, 234KB)Opens new window

PDF Document YGG Gwyr Proposed site plan (PDF, 503KB)Opens new window

PDF Document YGG Gwyr Proposed plans (PDF, 545KB)Opens new window

PDF Document YGG Gwyr Site Check Assess 2018 (PDF, 12MB)Opens new window

PDF Document YGG Gwyr Transport Assessment (PDF, 4MB)Opens new window

Design

This document shows you the layout and style of the buildings and roads on the proposed development.

PDF Document YGG Gwyr Design and Access Statement (PDF, 2MB)Opens new window

Drainage strategy report

PDF Document YGG Gwyr Drainage Strategy report (PDF, 448KB)Opens new window

Ecological surveys

PDF Document YGG Gwyr Ecological Impact Assessment Report (PDF, 3MB)Opens new window

How to comment

We need your comments by 3 December 2018.

If you would like to comment about this proposed development please look at the plans and then email Building.Services-PlanningRepresentation@swansea.gov.uk.

Or you can write to: Architectural Design Group, Corporate Building Services, Heol Y Gors, Cwmbwrla, Swansea, SA5 8LD.

What happens next

Your comments will be taken into consideration and then the decision will be made whether to progress this to a planning application. 

Comments you submit may be made available to the public, but your details e.g. your email or home address will not be shown. If this project moves to an application for planning permission, you will also be able to comment at that stage.

Free wifi and PCs available

If you need internet access or free wifi to view the plans and make your comments, please visit Gowerton Library or any other library in Swansea. Gowerton Library is open on:

DayMorningAfternoon
Monday10.00am - 1.00pm2.00pm - 5.00pm
Tuesday10.00am - 1.00pm2.00pm - 5.00pm
Wednesday10.00am - 1.00pm2.00pm - 5.00pm
Thursday10.00am - 1.00pm2.00pm - 5.00pm
Friday9.00am - 1.00pm2.00pm - 6.00pm
Saturday10.00am - 1.00pmClosed
Powered by GOSS iCM