Temporary road closures

Temporary road closures for road works or for the avoidance of danger to the public.

These may last for 1 day and up to 18 months, with extensions available in certain circumstances.

Temporary short term road closures - closures for less than 21 days.

Temporary long term road closures - closures for more than 21 days.

Special events road closures

 

Temporary short term road closures
Start dateDescriptionRoad affectedNotice
Sunday 30 January 2022For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 2 days to complete (9.00am - 3.00pm)

Notice - temporary road closure, B4436 Pennard Road, Bishopston

In order for Two Brothers Tree Surgeons to undertake (Ash die back) tree surgery.

Schedule

B4436 Pennard Road from its junction with Bishopston Road, in a south westerly direction to its junction with Kittle Hill Lane, a distance of approximately 700 metres.

The alternative route for vehicular traffic will be via the unaffected section of B4436 Pennard Road, B4436 Vennaway Lane, A4118 Fairwood Common, A4118 Gower Road, A4216 Sketty Park Road, A4216 Sketty Lane, A4067 Mumbles Road, B4436 Mayals Road and B4436 Northway, a distance of approximately 18 kilometres.

Similarly, this route will operate in the opposite direction.

Access for emergency vehicles to be maintained at all times.

Notice and plan - B4436 Pennard Road, Bishopston (PDF) [5MB]
Wednesday 26 January 2022For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 3 days to complete (9.30am - 3.00pm).

Notice - temporary road closure, Cadle Crescent, Cadle

In order for Swansea Council Planned Maintenance Section to undertake PATCH resurfacing works.

Schedule

Cadle Crescent in a south westerly direction from its junction with Pentregethin Road to its junction with Caeconna Road, a distance of approximately 560 metres.

The alternative route for vehicular traffic will be via Caeconna Road, Ffordd Y Brain and Pentregethin Road, a distance of approximately 1 kilometre.

This route will operate in the opposite direction.

No access or egress to Cadle Crescent when works are underway at its junction with Afon Lan Gardens, Caeconna Road and Cadle Close.

Access for emergency vehicles to be maintained at all times.

Notice and plan - Cadle Crescent, Cadle (PDF) [1MB]
Tuesday 25 January 2022For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 2 days to complete (9.30am - 3.00pm)

Notice - temporary road closure, Solva Road (part), Clase

In order for Swansea Council Planned Maintenance Section to undertake PATCH resurfacing works.

Schedule

Solva Road in a south westerly direction from its junction with Long View Road to its junction with Creswell Road, a distance of approximately 70 metres.

The alternative route for vehicular traffic will be via the unaffected section of Solva Road, Rheidol Avenue and Long View Road, a distance of approximately 1.3 kilometres.

This route will operate in the opposite direction.

Access for emergency vehicles to be maintained at all times.

Notice and plan - Solva Road (part), Clase (PDF) [625KB]
Monday 24 January 2022For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 5 days to complete (9.00am - 3.00pm)

Notice - temporary road closure, Langland Bay Road (part), Langland

In order for Monkey Tree Services to carry out tree trimming works.

Schedule

Langland Bay Road in a north easterly direction from its junction with Brynfield Road, a distance of approximately 270 metres.

The alternative route for vehicular traffic will be via Brynfield Road, B4593 Caswell Road, B4593 Southward Lane and via the unaffected section of Langland Bay Road a distance of approximately 1.7 kilometres.

This route will operate in the opposite direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

Notice - Langland Bay Road (part) (Word doc) [38KB]

Plan - Langland Bay Road (PDF) [1MB]

Monday 24 January 2022For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 5 days to complete.

Notice - temporary road closure, Courtney Street, Manselton

In order for Swansea Council Routine Maintenance Section to undertake subsidence remedial works.

Schedule

Courtney Street in a south westerly direction from its junction with B4489 Llangyfelach Road to its junction with Approach Road, a distance of approximately 500 metres.

The alternative route for vehicular traffic will be via Approach Road, Manselton Road, St John's Road, Penfilia Road and B4489 Llangyfelach Road, a distance of approximately 2.3 kilometres.

This route will not operate in the reverse direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

Notice - Courtney Street, Manselton (Word doc) [38KB]

Plan - Courtney Street, Manselton (PDF) [1MB]

Thursday 20 January 2022For 5 days (or until the works are completed whichever is sooner). It is anticipated the works will take 5 days to complete (9.30am - 3.00pm). No works are planned for Saturday 22nd January 2022.

Notice - temporary road closure, Penlan Road (part), Penlan

In order for Swansea Council Planned Maintenance Section to undertake PATCH resurfacing works.

Schedule

Penlan Road in a south westerly direction from its junction with B4489 Llangyfelach Road to its junction with Parkhill Terrace, for a distance of approximately 250 metres.

The alternative route for vehicular traffic will be via Parkhill Terrace, Parkhill Road and B4489 Llangyfelach Road, a distance of approximately 820 metres.

This route will operate in the opposite direction.

Access for emergency vehicles to be maintained at all times.

Notice - Penlan Road (part), Penlan (Word doc) [38KB]

Plan - Penlan Road (part), Penlan (PDF) [805KB]

Wednesday 12 January 2022For 21 days only (or until the works are completed whichever is the sooner). It is anticipated that the work will take 3 days to complete.

Notice - emergency road closures, Oxwich Village, Swansea

In order for Morrisons Contractor on behalf of Welsh Water to carry out a repair to a leaking water valve.

Schedule

Oxwich Village from the cross in a north westerly direction to Pitt Farm corner / Badgers' Hole a distance of approximately 1.3 kilometres.

The alternative route for vehicular traffic will be via the unnamed Y2086 known as Oxwich Green Road and unnamed Y2114, a distance of approximately 1.5 kilometres. Suitable for light vehicles only.

Access for emergency vehicles and pedestrians to be maintained at all times.

Emergency notice and plan - Oxwich Village (PDF) [320KB]
Monday 10 January 2022For 21 days (or until the works are completed whichever is the sooner). It is anticipated the work will take 3 days to complete.

Notice - temporary emergency road closure, Woodville Road, Mumbles

In orderfor Morrison Utility Services to carry out leakage works on behalf of Dwr Cymru.

Schedule

Woodville Road in a southerly direction from its junction with Queens Road to its junction with Overland Road, a distance of approximately 200 metres.

The alternative route for vehicular traffic will be via Queens Road, Dunns Lane, Oakland Road and Overland Road, a distance of approximately 340 metres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles to be maintained at all times.

Emergency notice and plan - Woodville Road, Mumbles (PDF) [568KB]
Monday 10 January 2022For 21 days (or until the works are completed whichever is the sooner). It is anticipated the work will take 3 days to complete.

Notice - temporary emergency road closure, Chapel Street, Mumbles

In order for Morrison Utility Services to carry out leakage works on behalf of Dwr Cymru.

Schedule

Chapel Street in a north easterly direction from its junction with Gower Place to its junction with B4593 Newton Road, a distance of approximately 120 metres.

The alternative route for vehicular traffic will be via Gower Place, Dunns Lane, The Dunns / Mumbles Road and B4593 Newton Road, a distance of approximately 550 metres.

Similarly this route will operate in the reverse direction.

No access / egress to / from Victoria Road whilst works are underway at its junction with Chapel Street.

Access for emergency vehicles to be maintained at all times.

Emergency notice and plan - Chapel Street, Mumbles (PDF) [396KB]
Friday 7 January 2022For 21 days (or until the works are completed whichever is the sooner). It is anticipated the work will take 3 days to complete.

Notice - temporary emergency road closure, Hendy Road, Penclawdd

In order for Dwr Cymru to carry out remedial mains leakage works.

Schedule

Hendy Road in a south easterly direction from its junction with Nurses Corner to its junction with Parc Hendy Crescent, a distance of approximately 350 metres.

The alternative route for vehicular traffic will be via unaffected section of Hendy Road, B4295 Station Road, B4295 Blodwen Terrace, B4295 Bellevue, B4295 Seaview, B4295 Glanmor Terrace, B4295 Beach Road, Victoria Road, Blue Anchor Road, Blaencedi and the unaffected section of Hendy Road, a distance of approximately 2.5 kilometres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

Emergency notice and plan - Hendy Road, Penclawdd (PDF) [601KB]
Thursday 6 January 2022For 21 days only (or until the works are completed whichever is sooner). It is anticipated the work will take 5 days to complete.

Notice - temporary emergency road closure, Vicarage Lane, Llangennith

In order for Morrison Utility Services to carry out water main leakage works on behalf of Dwr Cymru.

Schedule

Vicarage Lane in a southerly direction from its junction with Clos St Cenydd for a distance of approximately 340 metres.

There is no alternative route for vehicular traffic.

Access for emergency vehicles and pedestrians to be maintained at all times.

Emergency notice and plan - Vicarage Lane, Llangennith (PDF) [314KB]
Wednesday 5 January 2022For 21 days (or until the works are completed whichever is the sooner).

Notice - Temporary emergency road closure, Victoria Avenue, Mumbles

In order for Dwr Cymru to carry out stop leakage works at the above location.

Schedule

Victoria Avenue from its junction with Chapel Street, in a westerly direction to its junction with Stanley Street, a distance of approximately 150 metres.

The alternative route for vehicular traffic will be via Stanley Street, B4593 Newton Road and Chapel Street, a distance of approximately 300 metres.

Access for emergency vehicles and pedestrians to be maintained at all times.

Emergency notice - Victoria Avenue, Mumbles (Word doc) [51KB]

Plan - Victoria Avenue, Mumbles (PDF) [68KB]

 

 

 

Temporary long term road closures
Start dateDescriptionRoad affectedNotice
Monday 31 January 2022For 18 months, it is anticipated the work will take 15 months to complete.

Notice - temporary road closure, Cradock Street (part), City Centre

In order for RNF Property Group to carry out refurbishment works on the Albert Hall Building.

Schedule

Cradock Street in a north westerly direction from its junction with Northampton Lane / Pell Street to its junction with A4118 Mansel Street, a distance of approximately 60 metres.

The alternative route for vehicular traffic will be via The Kingsway, Christina Street and A4118 Mansel Street, a distance of approximately 450 metres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles to be maintained at all times.

1st Notice and plan - Cradock Street (part) (PDF) [379KB]

Monday 31 January 2022For a period of up to 6 months or until the works are completed.

Notice - temporary footpath closure, Footpaths MU2, MU5, MU6 and MU72

The closures are required for health and safety reasons whilst works are undertaken repairing, widening and realigning the footpath surface from Rotherslade where the path is in danger of collapse.

Schedule

Footpath Mumbles (MU2) - from the point at Rotherslade Bay grid ref SS 610873 in an easterly direction for approximately 450 metres to the junction with footpath MU3 grid ref SS 614871.

Footpath Mumbles (MU5) - From Higher Lane grid ref SS 613874 in a south westerly direction to Beaufort Road grid ref SS 615873 in a southerly direction to the junction with the coast path at grid ref SS 613871.

Footpath Mumbes (MU6) - From Higher Lane grid ref SS 610875 in a south easterly direction for 450 metres to the junction with the coast path at grid ref SS 612872 and from Beaufort Road grid ref SS 612873 in a south westerly direction for 200 metres.

Footpath Mumbles (MU72) - From Rotherslade Road at grid ref SS 610873.

No alternative route will be provided, but there are various routes and paths that can be used to bypass the works.

1st Notice and plan - Footpaths MU2, MU5, MU6 and MU72 (PDF) [10MB]

Wednesday 3 November 2021For 18 months and it is anticipated the work will take 60 weeks to complete.

Notice - temporary prohibition of parking, B4489 High Street and Prince of Wales Road (part), City Centre

In order for R&M Williams Limited to undertake development works on the Palace Theatre.

Schedule 1 - temporary parking prohibition B4489 High Street (part)

B4489 High Street in a north westerly direction from its junction with Matthew Street for a distance of approximately 55 metres.

Schedule 2 - temporary parking prohibition Prince of Wales Road (part)

Prince of Wales in a north easterly direction from its junction with B4489 High Street for a distance of approximately 50 metres.

2nd Notice and plan - B4489 High Street and Prince of Wales Road (part) (PDF) [305KB]

Monday 25 October 2021For 18 months. It is anticipated the works will take 18 months to complete.

Notice - temporary road closure, Access Lane off 277-278 Oxford Street

In order for Swansea Council Corporate Property Services to carry out refurbishment works to (former BHS store) 277-278 Oxford Street.

Schedule

Access lane in a north westerly direction adjacent to 277-278 Oxford Street from its junction with Oxford Street for a distance of approximately 55 metres.

The alternative route for pedestrian footfall will be via the car park rear of Marks and Spencers, Portland Street and Oxford Street, a distance of approximately 260 metres.

There is no alternative route for vehicular traffic.

Access for emergency vehicles to be maintained at all times.

2nd Notice and plan - Access lane, off 277-278 Oxford Street (PDF) [304KB]

Monday 18 October 2021For 18 months and it is anticipated the work will take 3 weeks to complete.

Notice - temporary road closures, Gwydr Crescent and Uplands Terrace

In order for Swansea Council Engineering Section to construct a central island at A4118 Uplands Crescent.

Schedule 1 - temporary road closure, Gwydr Crescent/Square, Uplands

Gwydr Crescent/Square in a north easterly direction from its junction with Beechwood Road to its junction with A4118 Uplands Crescent, a distance of approximately 40 metres.

The alternative route for vehicular traffic will be via Beechwood Road, Ernald Place, A4118 Sketty Road and A4118 Uplands Crescent, a distance of approximately 460 metres.

Schedule 2 - temporary road closure, Uplands Terrace, Uplands

Uplands Terrace in a north westerly direction from its junction with A4118 Uplands Crescent to its junction with Mirador Crescent a distance of approximately 80 metres.

The alternative route for vehicular traffic will be via Mirador Crescent and A4118 Uplands Crescent, a distance of approximately 400 metres.

Access for emergency vehicles and residents to be maintained at all times.

2nd Notice and plan - Gwydr Crescent and Uplands Terrace (PDF) [2MB]

Monday 20 September 2021For 18 months and it is anticipated the work will take 28 nights to complete (Monday - Friday only: 8.00pm - 6.00am).

Notice - temporary road closure, A4067 Oystermouth Road (part), City Centre

In order for Evan Pritchard (Forest Traffic Services) to carry out overnight resurfacing on A4067 Oystermouth Road.

Schedule 1 - temporary road closure (westbound traffic) A4067 Oystermouth Road (part), City Centre

A4067 Oystermouth Road in a westbound direction from its junction with A483 New Cut Road to its junction with West Way, a distance of approximately 1 kilometre.

The alternative route for westbound vehicular traffic will be via A483 New Cut Road, B4603 Bridge Street, A4118 Dyfatty Street, A4118 New Orchard Street, B4290 Orchard Street, B4290 The Kingsway, Dillwyn Street and West Way, a distance of approximately 3 kilometres.

Schedule 2 - temporary road closure (eastbound traffic) A4067 Oystermouth Road, City Centre

A4067 Oystermouth Road in an eastbound direction from its junction with West Way to its junction with A483 New Cut Road, a distance of approximately of 1 kilometre.

The alternative route for eastbound vehicular traffic will be via West Way, Dillwyn Street, B4290 The Kingsway, B4290 Orchard Street, A4118 New Orchard Street, A4118 Dyfatty Street B4603 Bridge Street, A483 New Cut Road and A483, a distance of approximately 3.3 kilometres.

Schedule 3 - temporary road closure, Albert Row, City Centre

No access or egress from the above road whilst works are underway.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

2nd Notice and plan - A4067 Oystermouth Road (part), City Centre (PDF) [7MB]

Monday 20 September 2021For 6 months and will be subject to extensions. It is anticipated the work will take 18 months to complete.

Notice - temporary footpath closure, Pottery Street, City Centre

To enable Putnum Construction Services Limited to safely undertake demolition of the former HMRC Ty Nant offices at 180 High Street.

Schedule

Pottery Street (subway) from its junction with Strand in a south westerly direction to its junction with B4489 High Street a distance of approximately 140 metres.

The alternative route for pedestrian footfall will be via Strand, A483 New Cut Road, Jockey Street, John Street, Prince of Wales Road and B4489 High Street, a distance of approximately 480 metres.

Access for emergency vehicles to be maintained at all times.

2nd Notice and plan - Pottery Street, City Centre (PDF) [333KB]

Monday 13 September 2021For 18 months and it is anticipated the work will take 12 months (8.00am - 5.00pm) to complete.

Notice - temporary road closure, Page Lane, City Centre

In order for Intelle Construction Limited to carry out refurbishment of Sun Alliance House at Page Lane (rear of 166/167 B4390 St Helens Road).

Schedule

Page Lane in a north easterly direction from its junction with Nicholl Street to its junction with Page Street, a distance of approximately 60 metres.

The alternative route for vehicular traffic will be via Nicholl Street, A4118 Walter Road and Page Street, a distance of approximately 310 metres.

This route will not operate in the reverse direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

1st Notice and plan - Page Lane, City Centre (PDF) [162KB]

2nd Notice and plan - Page Lane, City Centre (PDF) [161KB]

Tuesday 10 August 2021For 18 months, it is anticipated the work will take 6 months to complete (6.30pm - 6.00am).

Notice - temporary road closure, various locations, City Centre, Swansea

In order for Swansea Council Highways Improvements Section to undertake HRA resurfacing works at various City Centre locations.

Schedule 1 - temporary road closure, Kingsway, City Centre

Kingsway in a south westerly direction from its junction with College Street to its junction with B4290 St Helens Road/Dillwyn Street, a distance of approximately 500 metres.

The alternative route for vehicular traffic will be via Dillwyn Street, West Way, A4067 Oystermouth Road, A4067 Victoria Road, A4067 Quay Parade, A483 New Cut Road, Plantasia, Strand, Welcome Lane and College Street, a distance of approximately 2.4 kilometres.

Schedule 2 - temporary road closures, Orchard Street, Alexandra Road and Bellevue Way, City Centre

Orchard Street, Alexandra Road and Bellevue Way junctions.

The alternative route for vehicular traffic will be via Dillwyn Street, West Way, A4067 Oystermouth Road, A4067 Victoria Road, A4067 Quay Parade, A483 New Cut Road B4603 Bridge Street and A4118 Dyfatty Street, a distance of approximately 3.2 kilometres.

No access/egress to/from Kingsway whilst works are underway at its junction with:

  • Craddock Street
  • Christina Street
  • Dynevor Place
  • Portland Street
  • Park Street

Access for emergency vehicles to be maintained at all times.

1st Notice and plan - Various locations, City Centre (PDF) [5MB]
Monday 19 July 2021For 5 months and 19 days or until the works are completed.

Notice - temporary bridleway closure, Bridleway LC84 Burma Road, Llangyfelach

The closure is required for health and safety reasons whilst works are undertaken to facilitate the installation of a private wire connection from Morriston Hospital to Brynwhilach solar farm.

Schedule

Bridleway LC84 in Llangyfelach from a point at grid Ref. SN647000 for 850 metres, in a south easterly direction to a point at SN654994.

There will be no alernative route available.

2nd Notice and plan - Bridleway LC84 Burma Road Llangyfelach (PDF) [993KB]
Saturday 10 July 2021For 17 months 9 days, extending an existing Notice dated 17 June 2021. It is anticipated the closure will last for 17 months and 9 days. The effect of this closure will be made permanent by a further Order.

Notice - temporary road closure, Waun Wen Road (part), Mayhill

For safety reasons, Swansea Council has deemed it to be necessary to temporarily close the above road to vehicular traffic.

Schedule

Waun Wen Road in a south easterly direction from its junction with Long Ridge to its junction with High View a distance of approximately 35 metres.

The alternative route for vehicular traffic will be via the unaffected section of Waun Wen Road, Granogwen Road, Townhill Road, Gors Avenue, A483 Carmarthen Road and the unaffected section of Waun Wen Road, a distance of approximately 1.8 kilometres.

Access for pedestrians to be maintained at all times.

1st Notice and plan - Waun Wen Road (part), Mayhill (PDF) [1MB]

2nd Notice and plan - Waun Wen Road (part), Mayhill (PDF) [1MB]

Monday 21 June 2021For 18 months. It is anticipated the works will take 2 weeks to complete.

Notice - temporary one-way road closure Pentregethin Road, Cwmbwrla

In order for Swansea Council Engineering Team to undertake plateau construction works.

Schedule

Pentregethin Road in a northerly direction from its junction with A483 Carmarthen Road to its junction with Middle Road a distance of approximately 50 metres.

The alternative route for vehicular traffic will be via A483 Carmarthen Road, Approach Road, Manselton Road, St John's Road and the unaffected section of Pentregethin Road, a distance of approximately 2.1 kilometres.

Access for emergency vehicles to be maintained at all times.

2nd Notice and plan - Pentregethin Road, Cwmbwrla (PDF) [1MB]
Tuesday 15 June 2021For 17 months and 10 days, extending the closure made by Notice dated 25 May 2021. It is anticipated that this temporary order will continue until Welsh Government approval is confirmed to seal the permanent order.

Notice - temporary road closure, Albert Row, City Centre

In order for Buckingham Group to undertake works at the above location.

Schedule

Albert Row in a north westerly direction from its junction with Wellington Street, a distance of approximately 600 metres.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

1st Notice and plan - Albert Row, City Centre (PDF) [369KB]

2nd Notice and plan - Albert Row, City Centre (PDF) [368KB]

Monday 24 May 2021The maximum duration of the order is 18 months. It is anticipated the work will take 6 nights to complete (18:30-06:30) effective from Monday 24th May 2021.

Notice - temporary road closure Guildhall Road South and B4290 St Helens Road (part)

Schedule

Guildhall Road South and B4290 St Helens Road (part) from their junctions with
A4067 Mumbles Road to their junctions with Brynymor Road/Beach Street, a
distance of approximately 580 metres.

The alternative route for vehicular traffic will be via the unaffected section of B4290 St
Helens Road, Dillwyn Street, West Way and A4067 Oystermouth Road, a distance of
approximately 2.3 kilometres.

Access for emergency vehicles to be maintained at all times.

Notice and plan - Guildhall Road South and B4290 St Helens Road (part), City Centre (PDF) [1MB]

Monday 26 April 2021For 18 months. It is anticipated the work will take 10 days to complete (Monday to Friday 9.30am - 3.00pm).

Notice - temporary road closure, Brynfield Road (part), Langland

In order for Swansea Council Public Lighting Section to undertake lighting works.

Schedule

Brynfield Road in a north westerly direction from its junction with Langland Bay Road to its junction with Whiteshell Drive/Langland Court Road, a distance of approximately 250 metres.

The alternative route for vehicular traffic will be via the unaffected section of Brynfield Road, B4593 Caswell Road, B4593 Southward Lane and Langland Bay Road, a distance of approximately 1.7 kilometres.

Access for emergency vehicles to be maintained at all times.

2nd Notice and plan - Brynfield Road (part), Langland (PDF) [633KB]
Thursday 25 February 2021Until and including 24 August 2022 or until such time as the works are completed, whichever is earlier.

Notice - temporary footpath closure, LC40 Loughor

The closure is required to ensure the safety of the public whilst BDW Trading Ltd carry out construction vehicle movements across the footpath.

Schedule

From the point where footpath 40 leaves Glebe Road adjacent to number 101 (Grif Ref. 576980) in a southerly direction for approximately 531 metres or thereabouts to the point where footpath 40 intersects footpath no. 38 (Grif Ref. 576976).

No alternative route will be available.

Notice and plan - Footpath LC40 Loughor 1st extension (PDF) [1000KB]
Thursday 4 February 2021For 6 months or until the works are completed.

Notice - temporary bridleway closure, Bridleway LC84 Burma Road, Llangyfelach

The closure is required for health and safety reasons whilst works are undertaken to facilitate the installation of a private wire connection from Morriston Hospital to Brynwillach solar farm.

Schedule

Bridleway LC84 in Llangyfelach from a point at grid ref SN647000 for 850 metres in a south easterly direction to a point at SN654994.

There will be no alternative route available.

Notice and plan - Burma Road bridleway, Llangyfelach (PDF) [992KB]